The Planning Engineer's Field Handbook: Baseline to Closeout: A Practical Guide Building, Updating and Defending Construction Schedules (The Planner’s Library, Band 2)

Preise von
16,23

Gesponserte Links

ALLE WEBSHOPS VERGLEICHEN (2)

Beschreibung

The Planning Engineer's Field Handbook: Baseline to Closeout: A Practical Guide Building, Updating and Defending Construction Schedules (The Planner’s Library, Band 2)

Webshops vergleichen (2)

Gesponserte Links · Einige Shops zahlen uns eine Vergütung

Sortieren nach:

16,23 € Gratis Versand

16,23 € Gratis Versand

Beschreibung (0)

The Planning Engineer's Field Handbook: Baseline to Closeout: A Practical Guide Building, Updating and Defending Construction Schedules (The Planner’s Library, Band 2)


Produktspezifikationen

Marken Independently Published
EAN
  • 9798161728192

Hervorgehobene Wahl
16,23 €
Zum Shop